Projects

Phase 2A, 2B, 2C at TPTL 157, Sai Sha (Site A), Shap Sze Heung, N.T.

Project Title

Phase 2A, 2B, 2C at TPTL 157, Sai Sha (Site A), Shap Sze Heung, N.T.

 

Duration

2020 - 2021

 

Nature of Works

Socketed H-Pile, Grout Curtain, Pipe Pile Wall, Pre-boring Works for Steel Sheet Piles, King Post Works, Pumping Test and Trial Bored Piles Work for Design and Constrcuction of Piling Foundation and Pile Wall Works