Project Title
Phase 2A, 2B, 2C at TPTL 157, Sai Sha (Site A), Shap Sze Heung, N.T.
Duration
2020 - 2021
Nature of Works
Socketed H-Pile, Grout Curtain, Pipe Pile Wall, Pre-boring Works for Steel Sheet Piles, King Post Works, Pumping Test and Trial Bored Piles Work for Design and Constrcuction of Piling Foundation and Pile Wall Works