Projects

Design and Construction of Piling Works (Phase 2A) for the Proposed Residential and Recreational Development at TPTL no.157, Sai Sha (Site B), Shap Sze Heung, New Territories

Project Title

Design and Construction of Piling Works (Phase 2A) for the Proposed Residential and Recreational Development at TPTL no.157, Sai Sha (Site B), Shap Sze Heung, New Territories

 

Duration

2021 - 2022

 

Nature of Works

314 nos Grout Holes
158 nos 813mm Pipe Pile
118 nos 610mm Pipe-pile
Pumping Test